ActionItem NameCharting LabelLatitudeLongitudePublished DocumentKappRNC PanelRNC PostedPDF Posted
AddGreen Bay Harbor Entrance Channel Buoy WR31G C "WR31"N 44° 32' 16.100"W 088° 00' 18.000"LNM 36/21, 9th Dist144014916_369/16/20219/9/2021
AddObstruction in Feet15 Obstn Chart No. 1: K41N 44° 32' 16.090"W 088° 00' 18.030"LNM 36/21, 9th Dist144014916_369/2/20219/2/2021
AddBascule Bridge LabelBASCULE BRIDGE HOR CL 36 FT VERT CL 17 FT (CLOSED)N 44° 27' 10.670"W 088° 03' 47.320"LNM 32/19, 9th Dist143814916_348/1/20198/1/2019
AddBascule Bridge PT 2 OF 2Chart No. 1: D23.4N 44° 27' 01.810"W 088° 03' 50.300"LNM 32/19, 9th Dist143614916_328/1/20198/1/2019
AddBascule Bridge PT 2 OF 2Chart No. 1: D23.4N 44° 27' 01.810"W 088° 03' 50.300"LNM 32/19, 9th Dist143814916_348/1/20198/1/2019
AddBascule Bridge PT 1 OF 2Chart No. 1: D23.4N 44° 27' 02.160"W 088° 03' 49.900"LNM 32/19, 9th Dist143614916_328/1/20198/1/2019
AddBascule Bridge PT 1 OF 2Chart No. 1: D23.4N 44° 27' 02.160"W 088° 03' 49.900"LNM 32/19, 9th Dist143814916_348/1/20198/1/2019
AddFixed Bridge LabelFIXED BRIDGE HOR CL 40 FT VERT CL 15 FTN 44° 27' 04.480"W 088° 03' 45.400"LNM 32/19, 9th Dist143814916_348/1/20198/1/2019
AddBascule Bridge LabelBASCULE BRIDGE HOR CL 36 FT VERT CL 17 FT (CLOSED)N 44° 27' 10.680"W 088° 03' 47.260"LNM 32/19, 9th Dist143614916_328/1/20198/1/2019
AddNOTECAUTION - BASCULE BRIDGE CLEARANCES - For bascule bridges, whose spans do not open to a full upright or vertical position, unlimited vertical clearance is not available for the entire charted horizontal clearance.N 44° 27' 10.550"W 088° 01' 38.350"LNM 32/19, 9th Dist143814916_348/1/20198/1/2019
AddNOTECAUTION - BASCULE BRIDGE CLEARANCES - For bascule bridges, whose spans do not open to a full upright or vertical position, unlimited vertical clearance is not available for the entire charted horizontal clearance.N 44° 25' 52.100"W 088° 04' 54.000"LNM 32/19, 9th Dist143614916_328/1/20198/1/2019
AddFixed Bridge LabelFIXED BRIDGE HOR CL 40 FT VERT CL 15 FTN 44° 27' 04.500"W 088° 03' 45.440"LNM 32/19, 9th Dist143614916_328/1/20198/1/2019
AddFixed Bridge PT 2 OF 2Chart No. 1: D22N 44° 27' 02.410"W 088° 03' 49.660"LNM 32/19, 9th Dist143614916_328/1/20198/1/2019
AddFixed Bridge PT 2 OF 2Chart No. 1: D22N 44° 27' 02.410"W 088° 03' 49.660"LNM 32/19, 9th Dist143814916_348/1/20198/1/2019
AddFixed Bridge PT 1 OF 2Chart No. 1: D22N 44° 27' 02.880"W 088° 03' 49.310"LNM 32/19, 9th Dist143614916_328/1/20198/1/2019
AddFixed Bridge PT 1 OF 2Chart No. 1: D22N 44° 27' 02.880"W 088° 03' 49.310"LNM 32/19, 9th Dist143814916_348/1/20198/1/2019
AddFixed Bridge LabelFIXED BRIDGE HOR CL 125 FT VERT CL 25 FTN 44° 16' 37.190"W 088° 17' 48.720"LNM 32/19, 9th Dist143214916_288/1/20198/1/2019
AddFixed Bridge PT 2 OF 2Chart No. 1: D22N 44° 16' 33.120"W 088° 17' 47.540"LNM 32/19, 9th Dist143214916_288/1/20198/1/2019
AddFixed Bridge PT 1 OF 2Chart No. 1: D22N 44° 16' 33.770"W 088° 17' 47.730"LNM 32/19, 9th Dist143214916_288/1/20198/1/2019
RelocateGreen Bay City Buoy 20R N "20"N 44° 27' 59.034"W 088° 03' 16.140"LNM 26/19, 9th Dist143814916_347/4/20197/4/2019
AddNote - PROJECT DEPTHSChannel legends and tabulations, where indicated, reflect the U.S. Army Corps of Engineers (USACE) project depths. The channel may be significantly shoaler, particularly at the edges. For detailed channel information and minimum depths as reported by USACE, use NOAA Electronic Navigational Charts. USACE surveys and channel condition reports are available at http://navigation.usace.army.mil/Survey/HydroN 44° 31' 09.920"W 087° 58' 36.270"LNM 21/19, 9th Dist144014916_365/16/20195/16/2019
ChangeChannel reach label to:PROJECT DEPTH 24 FEET (see note)N 44° 32' 29.740"W 088° 00' 12.940"LNM 21/19, 9th Dist144014916_365/16/20195/16/2019
ChangeChannel reach label to:PROJECT DEPTH 24 FEET (see note)N 44° 31' 17.760"W 088° 00' 38.860"LNM 21/19, 9th Dist144014916_365/16/20195/16/2019
ChangeChannel reach label to:PROJECT DEPTH 24 FEET (see note)N 44° 30' 37.190"W 088° 01' 15.080"LNM 21/19, 9th Dist143914916_355/16/20195/16/2019
AddNote - PROJECT DEPTHSChannel legends and tabulations, where indicated, reflect the U.S. Army Corps of Engineers (USACE) project depths. The channel may be significantly shoaler, particularly at the edges. For detailed channel information and minimum depths as reported by USACE, use NOAA Electronic Navigational Charts. USACE surveys and channel condition reports are available at http://navigation.usace.army.mil/Survey/HydroN 44° 29' 46.250"W 088° 03' 01.710"LNM 21/19, 9th Dist143914916_355/16/20195/16/2019
ChangeChannel reach label to:PROJECT DEPTH 24 FEET (see note)N 44° 29' 57.100"W 088° 01' 24.580"LNM 21/19, 9th Dist143914916_355/16/20195/16/2019
AddChannel reach label:PROJECT DEPTH 22 FEET (see note)N 44° 29' 38.760"W 088° 01' 25.110"LNM 21/19, 9th Dist143914916_355/16/20195/16/2019
ChangeChannel reach label to:PROJECT DEPTH 20 FEET (see note)N 44° 29' 34.720"W 088° 01' 31.270"LNM 21/19, 9th Dist143914916_355/16/20195/16/2019
AddNote - PROJECT DEPTHSChannel legends and tabulations, where indicated, reflect the U.S. Army Corps of Engineers (USACE) project depths. The channel may be significantly shoaler, particularly at the edges. For detailed channel information and minimum depths as reported by USACE, use NOAA Electronic Navigational Charts. USACE surveys and channel condition reports are available at http://navigation.usace.army.mil/Survey/HydroN 44° 28' 14.980"W 088° 04' 24.540"LNM 21/19, 9th Dist143814916_345/16/20195/16/2019
ChangeChannel reach label to:PROJECT DEPTH 18 FEET (see note)N 44° 27' 11.510"W 088° 04' 00.750"LNM 21/19, 9th Dist143614916_325/16/20195/16/2019
ChangeChannel reach label to:PROJECT DEPTH 18 FEET (see note)N 44° 29' 07.100"W 088° 02' 06.870"LNM 21/19, 9th Dist143914916_355/16/20195/16/2019
ChangeChannel reach label to:PROJECT DEPTH 18 FEET (see note)N 44° 27' 49.330"W 088° 03' 23.130"LNM 21/19, 9th Dist143814916_345/16/20195/16/2019
AddNote - PROJECT DEPTHSChannel legends and tabulations, where indicated, reflect the U.S. Army Corps of Engineers (USACE) project depths. The channel may be significantly shoaler, particularly at the edges. For detailed channel information and minimum depths as reported by USACE, use NOAA Electronic Navigational Charts. USACE surveys and channel condition reports are available at http://navigation.usace.army.mil/Survey/HydroN 44° 26' 36.640"W 088° 04' 37.530"LNM 21/19, 9th Dist143614916_325/16/20195/16/2019
ChangeFixed BridgeChart No. 1: D22N 44° 02' 44.810"W 088° 34' 53.550"LNM 36/18, 9th Dist141914916_159/6/20189/6/2018
ChangeFixed Bridge LabelFIXED BRIDGE HOR CL 118 FT VERT CL 28 FTN 44° 02' 45.240"W 088° 34' 55.300"LNM 36/18, 9th Dist141914916_159/6/20189/6/2018
DeleteNoteBridge under construction caution note.N 44° 03' 02.959"W 088° 33' 35.165"LNM 36/18, 9th Dist141914916_159/6/20189/6/2018
ChangeFixed BridgeChart No. 1: D22N 44° 02' 45.240"W 088° 34' 55.300"LNM 36/18, 9th Dist141914916_159/6/20189/6/2018
DeleteMagenta Bridge LabelCAUTIONN 44° 00' 35.000"W 088° 32' 59.000"LNM 34/18, 9th Dist141814916_148/16/20188/16/2018
DeleteDraw Bridge draw bridgeN 44° 00' 38.510"W 088° 32' 02.080"LNM 34/18, 9th Dist141814916_148/16/20188/16/2018
AddBascule Bridge PT 2 OF 2bascule bridge N 44° 00' 43.440"W 088° 32' 00.460"LNM 34/18, 9th Dist141814916_148/16/20188/16/2018
AddBascule Bridge PT 1 OF 2bascule bridge N 44° 00' 38.830"W 088° 32' 02.610"LNM 34/18, 9th Dist141814916_148/16/20188/16/2018
AddBridge Clearance LabelBASCULE BRIDGE HOR CL 103 FT VERT CL 6 FTN 44° 00' 48.000"W 088° 32' 16.000"LNM 34/18, 9th Dist141814916_148/16/20188/16/2018
DeleteBridge Clearance LabelDRAWBRIDGE HOR CL R DRAW 70 FT REP HOR CL L DRAW 70 FT REP VERT CL 6 FTN 44° 00' 48.000"W 088° 32' 16.000"LNM 34/18, 9th Dist141814916_148/16/20188/16/2018
DeleteBridge ConstructionMagenta screen extending 500 feet from bridgeN 44° 00' 48.000"W 088° 32' 16.000"LNM 34/18, 9th Dist141814916_148/16/20188/16/2018
DeleteBridge Construction LabelBridge under construction (see note)N 44° 00' 41.000"W 088° 32' 22.000"LNM 34/18, 9th Dist141814916_148/16/20188/16/2018
ChangeFixed Bridge LabelFIXED BRIDGE HOR CL 402 FT VERT CL 119 FTN 44° 32' 00.680"W 088° 00' 29.580"LNM 32/18, 9th Dist144014916_368/2/20188/2/2018
RelocateGreen Bay City Buoy 4R N "4"N 44° 29' 28.179"W 088° 01' 38.832"LNM 23/18, 9th Dist143914916_356/14/20186/14/2018
RelocateGreen Bay City Buoy 26R N "26"N 44° 27' 13.311"W 088° 04' 01.513"LNM 23/18, 9th Dist143614916_326/14/20186/14/2018
RelocateGreen Bay City Buoy 26R N "26"N 44° 27' 13.311"W 088° 04' 01.513"LNM 23/18, 9th Dist143814916_346/14/20186/14/2018
RelocateGreen Bay City Buoy 24R N "24"N 44° 27' 27.146"W 088° 03' 47.615"LNM 19/17, 9th Dist143814916_345/18/20175/18/2017


This listing provides all corrections to this chart since 4/13/2016 6:26:00 PM, the Release Date of Edition 11.

Edition: 11, Print Date: Mar. /2016
Edition: 10, Print Date: Jul. /2002
Edition: 9, Print Date: 8/15/1998


To specify a different date, enter it here and click

Download Text File of the listing.

Search Again



DISCLAIMER

While information provided by this listing is intended to assist in the updating of nautical charts, it must not be used as a substitute for the United States Coast Guard, National Geospatial-Intelligence Agency or Canadian Coast Guard Notice to Mariner publications.

The information available on this listing is derived from the NOS Critical Chart Corrections database (CRIT), which is used as an in-house chart production tool, and may contain some naming conventions, textual abbreviations or acronyms that are unfamiliar to the general public.

Due to ongoing development of the NOS Critical Chart Corrections database (CRIT) throughout the previous decade of the 1990’s, channel tabulations, depth legends, depth notes and chartlets may not be included in chart update listings prior to January 2000.

Requesting this listing signifies acknowledgement of having read the above disclaimer.


TERMS AND CONDITIONS

1. The user agrees not to copy or distribute the chart updates from this listing, nor to send the chart updates from this listing to any other server or location for further reproduction or distribution, unless the following conditions are followed: a) the NOAA Chart Update Disclaimer in its entirety is displayed to anyone who accesses the chart updates, and b) a reference to the NOAA Chart Update web site is included so that anyone accessing the chart updates is advised of where they originated.

2. The user acknowledges that should these chart updates be incorporated into any other product in a form other than as provided by the NOAA Chart Update web site, the producer of that product assumes full liability.

3. The user acknowledges that information provided by the NOAA Chart Update web site is intended as a tool for the convenient updating of nautical charts, but it must not be used as a substitute for the United States Coast Guard, National Imagery & Mapping Agency or Canadian Coast Guard Notice to Mariner publications.

4. The user acknowledges that certain information, such as temporary changes to aids to navigation, special published announcements and other important information affecting navigational safety, are not available on the NOAA Chart Update web site.

Requesting this listing signifies acknowledgement of having read the above terms and conditions.