Action | Item Name | Charting Label | Latitude | Longitude | Published Document | Kapp | RNC Panel | RNC Posted | PDF Posted |
Change | Bridge Construction Label | Bridge under construction (see note) | N 32° 09' 55.200" | W 081° 09' 20.900" | LNM 51/22, 7th Dist | 232 | 11514_1 | 12/15/2022 | 12/15/2022 |
Change | Bridge Construction PT 2 OF 2 | Chart No. 1: D.d, with magenta screen extending 500 feet from bridge | N 32° 09' 55.149" | W 081° 09' 24.009" | LNM 51/22, 7th Dist | 232 | 11514_1 | 12/15/2022 | 12/15/2022 |
Change | Bridge Construction PT 1 OF 2 | Chart No. 1: D.d, with magenta screen extending 500 feet from bridge | N 32° 09' 55.680" | W 081° 09' 11.880" | LNM 51/22, 7th Dist | 232 | 11514_1 | 12/15/2022 | 12/15/2022 |
Add | Bridge under construction note | CAUTION Fixed and floating obstructions, some submerged, may exist within the magenta tinted bridge construction area. Mariners are advised to proceed with caution. | N 32° 09' 55.200" | W 081° 09' 20.900" | LNM 51/22, 7th Dist | 232 | 11514_1 | 12/15/2022 | 12/15/2022 |
Add | regulated area, (use Chart No. 1: N2.1 or N2.2) PT 2 OF 2 | regulated area, (use Chart No. 1: N2.1 or N2.2) | N 32° 04' 56.990" | W 081° 02' 12.000" | LNM 48/20, 7th Dist | 232 | 11514_1 | 11/26/2020 | 11/26/2020 |
Add | regulated area, (use Chart No. 1: N2.1 or N2.2) PT 1 OF 2 | regulated area, (use Chart No. 1: N2.1 or N2.2) | N 32° 05' 12.910" | W 081° 02' 20.090" | LNM 48/20, 7th Dist | 232 | 11514_1 | 11/26/2020 | 11/26/2020 |
Add | regulated area label | REGULATED NAVIGATION AREA 165.756 (see note A) | N 32° 05' 02.800" | W 081° 02' 09.000" | LNM 48/20, 7th Dist | 232 | 11514_1 | 11/26/2020 | 11/26/2020 |
Delete | Obstruction in Feet | 36 Obstn Chart No. 1: K41 | N 32° 07' 12.000" | W 081° 07' 58.000" | LNM 44/20, 7th Dist | 232 | 11514_1 | 11/5/2020 | 11/5/2020 |
Relocate | Port Wentworth Channel Daybeacon 24 | R "24" | N 32° 09' 07.021" | W 081° 08' 44.150" | LNM 42/20, 7th Dist | 232 | 11514_1 | 10/29/2020 | 10/29/2020 |
Change | Channel Reach Name | WHITEHALL CHANNEL 102 | N 32° 09' 30.960" | W 081° 09' 16.540" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 2 OF 2 | magenta reach separator line | N 32° 06' 28.190" | W 081° 07' 18.540" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 1 OF 2 | magenta reach separator line | N 32° 06' 31.270" | W 081° 07' 12.840" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 2 OF 2 | magenta reach separator line | N 32° 04' 46.570" | W 081° 02' 42.900" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 1 OF 2 | magenta reach separator line | N 32° 04' 53.330" | W 081° 02' 44.690" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Project Depth Legend - CITY FRONT CHANNEL to: | PROJECT DEPTH 42 FT (see note) | N 32° 04' 54.340" | W 081° 05' 07.900" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Project Depth Legend - WRECKS CHANNEL to: | PROJECT DEPTH 42 FT (see note) | N 32° 04' 50.400" | W 081° 03' 23.680" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Change | Depth Legend to: | 37 1/2 FT 2017 | N 32° 04' 45.890" | W 081° 02' 49.330" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Project Depth Legend - MARSH ISLAND TURNING BASIN to: | PROJECT DEPTH 34 FT (see note) | N 32° 06' 44.510" | W 081° 07' 21.590" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Project Depth Legend - FIG ISLAND TURNING BASIN to: | PROJECT DEPTH 34 FT (see note) | N 32° 04' 50.780" | W 081° 04' 08.350" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Depth Note - PROJECT DEPTHS to: | Channel legends and tabulations, where indicated, reflect the U.S. Army Corps of Engineers (USACE) project depths. The channel may be significantly shoaler, particularly at the edges. For detailed channel information and minimum depths as reported by USACE, use NOAA Electronic Navigational Charts. USACE surveys and channel condition reports are available at http://navigation.usace.army.mil/Survey/Hydro. | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 2 OF 2 | magenta reach separator line | N 32° 05' 16.590" | W 081° 05' 57.690" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 1 OF 2 | magenta reach separator line | N 32° 05' 20.730" | W 081° 05' 54.210" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 2 OF 2 | magenta reach separator line | N 32° 04' 41.980" | W 081° 04' 27.540" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 1 OF 2 | magenta reach separator line | N 32° 04' 47.700" | W 081° 04' 27.200" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Project Depth Legend - MARSH ISLAND CHANNEL to: | PROJECT DEPTH 42 FT (see note) | N 32° 05' 48.500" | W 081° 06' 28.900" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Depth Legend - PORT WENTWORTH 110+500 to: | PROJECT DEPTH 30 FT (see note) | N 32° 09' 30.910" | W 081° 09' 16.390" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Project Depth Legend - PORT WENTWORTH 105+500 to: | PROJECT DEPTH 30 FT (see note) | N 32° 09' 07.770" | W 081° 08' 56.180" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Project Depth Legend - WHITEHALL CHANNEL 103 to: | PROJECT DEPTH 36 FT (see note) | N 32° 08' 41.310" | W 081° 08' 30.520" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 4 OF 4 | Chart No. 1: I20 | N 32° 09' 42.600" | W 081° 09' 19.560" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 3 OF 4 | Chart No. 1: I20 | N 32° 09' 41.190" | W 081° 09' 19.560" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 2 OF 4 | Chart No. 1: I20 | N 32° 09' 42.390" | W 081° 09' 17.250" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 1 OF 4 | Chart No. 1: I20 | N 32° 09' 41.160" | W 081° 09' 17.260" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 3 OF 3 | Chart No. 1: I20 | N 32° 08' 28.900" | W 081° 08' 34.920" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 2 OF 3 | Chart No. 1: I20 | N 32° 08' 26.740" | W 081° 08' 35.520" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 1 OF 3 | Chart No. 1: I20 | N 32° 08' 04.540" | W 081° 08' 32.060" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Change | Channel Reach Name | PORT WENTWORTH 105+500 | N 32° 09' 07.870" | W 081° 08' 56.190" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Channel Reach Name | WHITEHALL CHANNEL 103 | N 32° 08' 40.500" | W 081° 08' 30.330" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 2 OF 2 | magenta reach separator line | N 32° 09' 21.350" | W 081° 09' 17.310" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 1 OF 2 | magenta reach separator line | N 32° 09' 23.270" | W 081° 09' 10.740" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 2 OF 2 | magenta reach separator line | N 32° 08' 52.140" | W 081° 08' 33.700" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 1 OF 2 | magenta reach separator line | N 32° 08' 54.110" | W 081° 08' 30.340" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 2 OF 2 | magenta reach separator line | N 32° 08' 18.350" | W 081° 08' 33.660" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 1 OF 2 | magenta reach separator line | N 32° 08' 18.830" | W 081° 08' 29.040" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 4 OF 4 | Chart No. 1: I20 | N 32° 08' 30.830" | W 081° 08' 27.560" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 3 OF 4 | Chart No. 1: I20 | N 32° 08' 28.780" | W 081° 08' 30.230" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 2 OF 4 | Chart No. 1: I20 | N 32° 08' 26.610" | W 081° 08' 30.760" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 1 OF 4 | Chart No. 1: I20 | N 32° 08' 05.970" | W 081° 08' 27.730" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Project Depth Legend - KINGS ISLAND CHANNEL to: | PROJECT DEPTH 42 FT (see note) | N 32° 06' 48.970" | W 081° 07' 32.660" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Project Depth Legend - ARGYLE ISLAND TURNING BASIN to: | PROJECT DEPTH 30 FEET (see note) | N 32° 08' 33.040" | W 081° 08' 27.980" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Channel Limits PT 4 OF 4 | Chart No. 1: I20 | N 32° 09' 05.280" | W 081° 08' 43.380" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Channel Limits PT 3 OF 4 | Chart No. 1: I20 | N 32° 09' 00.480" | W 081° 08' 36.160" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Channel Limits PT 2 OF 4 | Chart No. 1: I20 | N 32° 08' 53.060" | W 081° 08' 29.390" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Channel Limits PT 1 OF 4 | Chart No. 1: I20 | N 32° 08' 48.130" | W 081° 08' 27.980" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Channel Limits PT 2 OF 2 | Chart No. 1: I20 | N 32° 08' 25.060" | W 081° 08' 28.630" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Channel Limits PT 1 OF 2 | Chart No. 1: I20 | N 32° 08' 17.550" | W 081° 08' 27.690" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 4 OF 4 | Chart No. 1: I20 | N 32° 09' 38.960" | W 081° 09' 17.260" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 3 OF 4 | Chart No. 1: I20 | N 32° 09' 30.680" | W 081° 09' 17.520" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 2 OF 4 | Chart No. 1: I20 | N 32° 09' 21.150" | W 081° 09' 13.350" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 1 OF 4 | Chart No. 1: I20 | N 32° 09' 17.680" | W 081° 09' 10.510" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 5 OF 5 | Chart No. 1: I20 | N 32° 09' 10.140" | W 081° 08' 59.870" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 4 OF 5 | Chart No. 1: I20 | N 32° 09' 09.010" | W 081° 08' 57.910" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 3 OF 5 | Chart No. 1: I20 | N 32° 09' 05.010" | W 081° 08' 44.510" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 2 OF 5 | Chart No. 1: I20 | N 32° 09' 00.030" | W 081° 08' 36.790" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 1 OF 5 | Chart No. 1: I20 | N 32° 08' 48.130" | W 081° 08' 27.980" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 4 OF 4 | Chart No. 1: I20 | N 32° 08' 25.050" | W 081° 08' 28.640" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 3 OF 4 | Chart No. 1: I20 | N 32° 08' 23.070" | W 081° 08' 29.060" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 2 OF 4 | Chart No. 1: I20 | N 32° 08' 19.130" | W 081° 08' 28.450" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Limits PT 1 OF 4 | Chart No. 1: I20 | N 32° 08' 17.560" | W 081° 08' 27.720" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Delete | Channel Reach Name | RHODES CUT | N 32° 08' 55.680" | W 081° 08' 34.530" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Change | Channel Reach Name | PORT WENTWORTH 110+500 | N 32° 09' 30.720" | W 081° 09' 16.640" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Project Depth Legend - OGLETHORPE RANGE to: | PROJECT DEPTH 42 FT (see note) | N 32° 04' 54.540" | W 081° 02' 26.170" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Channel Limits PT 2 OF 2 | Chart No. 1: I20 | N 32° 08' 18.830" | W 081° 08' 29.040" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Channel Limits PT 1 OF 2 | Chart No. 1: I20 | N 32° 08' 18.950" | W 081° 08' 27.910" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Channel Limits PT 2 OF 2 | Chart No. 1: I20 | N 32° 08' 28.900" | W 081° 08' 34.920" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Channel Limits PT 1 OF 2 | Chart No. 1: I20 | N 32° 08' 04.590" | W 081° 08' 32.010" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Channel Limits PT 2 OF 2 | Chart No. 1: I20 | N 32° 08' 28.780" | W 081° 08' 30.230" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Channel Limits PT 1 OF 2 | Chart No. 1: I20 | N 32° 08' 05.500" | W 081° 08' 27.440" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 2 OF 2 | magenta reach separator line | N 32° 08' 28.900" | W 081° 08' 34.920" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | magenta reach separator line PT 1 OF 2 | magenta reach separator line | N 32° 08' 28.780" | W 081° 08' 30.230" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Project Depth Legend - WHITEHALL CHANNEL 102 to: | PROJECT DEPTH 42 FT (see note) | N 32° 08' 23.310" | W 081° 08' 32.210" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Add | Project Depth Legend - KINGS ISLAND TURNING BASIN to: | PROJECT DEPTH 50 FT (see note) | N 32° 07' 57.980" | W 081° 08' 16.680" | LNM 36/19, 7th Dist | 232 | 11514_1 | 8/29/2019 | 8/29/2019 |
Relocate | Barnwell Island Flats Lighted Buoy 52A | R "52A" Fl R 2.5s | N 32° 05' 00.804" | W 081° 02' 19.242" | LNM 19/19, 7th Dist | 232 | 11514_1 | 5/16/2019 | 5/16/2019 |
Change | tabulation - Savannah River Channel Depths | tabulation - Savannah River Channel Depths | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 05/18, 7th Dist | 232 | 11514_1 | 1/25/2018 | 1/25/2018 |
Relocate | Kings Island Turning Basin Range Front Light | Q Y 15ft | N 32° 07' 34.948" | W 081° 08' 04.055" | LNM 36/17, 7th Dist | 232 | 11514_1 | 9/21/2017 | 9/21/2017 |
Change | tabulation - Savannah River Channel Depths | tabulation - Savannah River Channel Depths | N 32° 07' 01.540" | W 081° 03' 55.960" | LNM 35/17, 7th Dist | 232 | 11514_1 | 8/31/2017 | 8/31/2017 |
Delete | City Front Channel Light 62 | Fl R 4s 16ft 5M "62" | N 32° 04' 48.841" | W 081° 04' 29.645" | LNM 21/17, 7th Dist | 232 | 11514_1 | 6/1/2017 | 6/1/2017 |
Change | tabulation - Savannah River Channel Depths | tabulation - Savannah River Channel Depths | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 15/17, 7th Dist | 232 | 11514_1 | 4/6/2017 | 4/13/2017 |
Change | tabulation - Savannah River | tabulation - Savannah River | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 30/16, 7th Dist | 232 | 11514_1 | 8/4/2016 | 8/4/2016 |
Change | tabulation - Savannah River Channel Depths | tabulation - Savannah River Channel Depths | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 44/15, 7th Dist | 232 | 11514_1 | 10/29/2015 | 10/29/2015 |
Change | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 41/15, 7th Dist | 232 | 11514_1 | 10/8/2015 | 10/8/2015 |
Change | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 39/15, 7th Dist | 232 | 11514_1 | 10/1/2015 | 9/24/2015 |
Change | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 33/15, 7th Dist | 232 | 11514_1 | 8/13/2015 | 8/13/2015 |
Change | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 29/15, 7th Dist | 232 | 11514_1 | 7/16/2015 | 7/16/2015 |
Change | Marsh Island Turning Basin Light 6 | Fl R 2.5s 16ft 5M "6" | N 32° 06' 49.614" | W 081° 07' 24.048" | LNM 25/15, 7th Dist | 232 | 11514_1 | 7/2/2015 | 7/2/2015 |
Change | Marsh Island Turning Basin Light 4 | Fl R 2.5s 16ft 5M "4" | N 32° 06' 41.712" | W 081° 07' 15.890" | LNM 25/15, 7th Dist | 232 | 11514_1 | 7/2/2015 | 7/2/2015 |
Change | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 20/15, 7th Dist | 232 | 11514_1 | 5/21/2015 | 5/21/2015 |
Delete | Marsh Island Turning Basin Light 8 | Fl R 4s 16ft 3M "8' | N 32° 06' 59.603" | W 081° 07' 37.882" | LNM 16/15, 7th Dist | 232 | 11514_1 | 4/30/2015 | 4/30/2015 |
Change | Port Wentworth Channel Light 34 | Fl R 4s 16ft 5M "34" | N 32° 09' 28.544" | W 081° 09' 12.466" | LNM 10/15, 7th Dist | 232 | 11514_1 | 3/19/2015 | 3/19/2015 |
Change | Port Wentworth Channel Light 32 | Fl R 4s 16ft 5M "32" | N 32° 09' 22.662" | W 081° 09' 09.930" | LNM 10/15, 7th Dist | 232 | 11514_1 | 3/19/2015 | 3/19/2015 |
Change | Port Wentworth Channel Light 30 | Fl R 4s 16ft 5M "30" | N 32° 09' 17.996" | W 081° 09' 08.737" | LNM 10/15, 7th Dist | 232 | 11514_1 | 3/19/2015 | 3/19/2015 |
Change | Kings Island Turning Basin Light 14 | Fl R 4s 16ft 5M "14" | N 32° 08' 07.924" | W 081° 08' 14.144" | LNM 10/15, 7th Dist | 232 | 11514_1 | 3/19/2015 | 3/19/2015 |
Change | Kings Island Turning Basin Light 12 | Fl R 6s 16ft 5M "12" | N 32° 07' 54.581" | W 081° 08' 04.510" | LNM 10/15, 7th Dist | 232 | 11514_1 | 3/19/2015 | 3/19/2015 |
Change | Port Wentworth Channel Light 28 | Fl R 4s 16ft 5M "28" | N 32° 09' 14.264" | W 081° 09' 05.448" | LNM 10/15, 7th Dist | 232 | 11514_1 | 3/19/2015 | 3/19/2015 |
Change | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 10/15, 7th Dist | 232 | 11514_1 | 3/12/2015 | 3/12/2015 |
Change | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 06/15, 7th Dist | 232 | 11514_1 | 2/5/2015 | 2/5/2015 |
Change | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 01/15, 7th Dist | 232 | 11514_1 | 1/29/2015 | 1/1/2015 |
Change | Depth Legend - Savannah River to: | 35 1/2 FT 2014 | N 32° 04' 46.000" | W 081° 02' 49.000" | LNM 01/15, 7th Dist | 232 | 11514_1 | 1/1/2015 | 1/1/2015 |
Change | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | tabulation - SAVANNAH RIVER CHANNEL DEPTHS | N 32° 07' 27.000" | W 081° 04' 45.000" | LNM 48/14, 7th Dist | 232 | 11514_1 | 12/4/2014 | 12/4/2014 |